Bored Pile Rebar Cage Welding Machine
High-Efficiency Automatic Production: Fully automatic CNC control with resistance welding technology delivers 3–4 times the efficiency of manual work, ensuring fast forming speed and continuous 24-hour operation for large-scale production.
Superior Welding Quality & Strength Retention: DC resistance welding ensures stable current, firm weld joints without spatter, and weld strength loss ≤5%, meeting high-standard pile foundation requirements.
Flexible Application & Cost-Effective Operation: Compatible with square and round piles, multiple bar specifications, and both MF and PF versions, providing energy savings, reduced labor costs, and strong adaptability for various foundation projects.
Bored Pile Rebar Cage Welding Machine
The Bored Pile Rebar Cage Welding Machine is a fully automatic professional system designed for manufacturing high-strength concrete pipe pile reinforcement cages. The machine features minimal welding strength loss, fast forming speed, a well-structured design, and easy maintenance.
With modern variable frequency control and an advanced human-machine interface (HMI), the system ensures stable, reliable operation and consistent high-quality reinforcement cage production even under long-term, high-speed running conditions.
Versions Available
Medium Frequency (MF) Version
Adopts medium-frequency inverter technology, saving over 30% energy. Provides more stable welding current and more uniform weld points. Ideal for high-precision and large-batch pipe pile production.Power Frequency (PF) Version
Uses a traditional power-frequency transformer with mature technology, low failure rate, and convenient maintenance. Cost-effective and suitable for small to medium production capacity and standard pipe pile processing needs.
Key Advantages
Universal for Square & Round Piles
One machine processes both square and round pipe pile reinforcement cages, eliminating the need for additional equipment and reducing investment costs.Core Resistance Welding Technology
DC power supply ensures rapid heating and high thermal efficiency. Weld joints are firm, spatter-free, with strength loss ≤5%, far superior to traditional welding methods.Fully Automatic CNC Control
PLC + variable frequency speed control system with precise preset spiral pitch and cage length. Minimizes errors and eliminates the precision limitations of manual welding.High Efficiency & Material Saving
Welding line speed reaches 3000 mm/min, delivering 3–4 times the efficiency of manual work. Spiral bars require no overlapping, saving approximately 1.5% material. Only five workers are needed per shift.Stable, Durable & Easy to Operate
Intelligent fault alerts and touchscreen operation enable operators to get started within 30 minutes. Supports 24-hour continuous production for large-scale manufacturing.Multi-Specification Compatibility
Processes various diameters of longitudinal and spiral bars, meeting full-specification production requirements for pipe pile foundation projects.
Core Application Areas
Pipe Pile Manufacturers
Standardized production of reinforcement cages for precast concrete square and round piles.Infrastructure Prefabrication Plants
Reinforcement cage production for bridge, high-speed railway, highway, port, and dock foundation piles.Building Construction Bases
Pipe pile processing for residential, commercial, and industrial building foundations.Municipal Engineering Sites / Prefab Zones
Urban roads, underground pipeline systems, wastewater treatment plants, and other municipal foundation projects.Professional Pile Foundation Contractors
On-site prefabrication of reinforcement cages for subcontracted pile foundation projects.Water Conservancy Projects
Reservoirs, dams, river regulation, and hydraulic engineering pile foundations.
Suitable for standardized and high-efficiency production of various pile foundation reinforcement cages.
Machine Structure
The Bored Pile Rebar Cage Welding Machine mainly consists of a machine head, tail frame, trolley, bar placing platform, and electrical control cabinet.
| Name | Description | Remarks |
Bar Placing Platform | Used to place steel bars | Manufactured by supplier |
Rolling Welding Drum | Holds equal-diameter copper disc | Must be insulated from machine base |
Rolling Welding Mechanism | Press-welds spiral bars onto longitudinal bars | — |
Wire Feeding Device | Feeds spiral bars | Avoid overfilling the wire tray |
Machine Base | Installation base | Must not be electrically connected to tail frame |
Trolley | Pulls longitudinal bars forward | — |
Tail Frame | Guide rail for trolley traction | — |
Technical Specifications
| Item | Technical Specification |
Cage Diameter | Ø300, Ø400, Ø500, Ø600 |
Cage Length | 7–15 m (extendable up to 45 m in special cases) |
Number of Longitudinal Bars | 6, 7, 10 or 7, 10, 12, 14 (customized) |
Longitudinal Bar Diameter | Ø7.1, Ø9.0, Ø10.7 |
Spiral Bar Diameter | Ø4–Ø6 |
Spiral Pitch | 0–100 mm |
Traction Speed | Max. 7500 mm/min |
Driving Power | 8.4 kW |
Welding Power | 300 kVA |
Main Machine Speed | 0–80 r/min |
Welding Method | Resistance welding |
Control Mode | Automatic control |
Applicable Material | Steel with carbon content <0.20% |
Weld Strength Loss | ≤5% |
Tensile or Shear Force at Weld Point | ≥200 kg |
Welding Transformer Cooling | Air cooling / Self-cooling |
Power Supply | 380V ±5% / 50Hz |
Ambient Temperature | -5℃ to +35℃ |
Relative Humidity | <85% |
Machine Weight | Approx. 5 tons |





